1. |
Measure the pressure of high pressure line by
measuring voltage output between NO.1 and NO.2
terminals.
|
2. |
Inspect the voltage value whether it is
sufficient to be regular value or not.
Voltage = 0.00878835 * Pressure + 0.5
| |
3. |
If the measured voltage value is not
specification, replace the A/C pressure
transducer. |
1. |
Disconnect the negative (-) battery
terminal. |
2. |
Recover the refrigerant with a
recovery/charging station. |
3. |
Remove the A/C pressure transducer (B) after
disconnecting the connector (A).
Tightening
torque:
10~12 N.m (1.02~1.22 kgf.m, 7.4~8.8
lb-ft)
|
Take care that liquid & suction pipe
are not
bent. | |
4. |
Installation is the reverse order of
removal. | |