OIL CONTROL VALVE (OCV) INSPECTION
OIL CONTROL VALVE (OCV) INSPECTION
SM1665890
id011000801400
Coil Resistance Inspection
1.Measure the resistance between terminals A and B using an ohmmeter.
-
• If it is not within the specification, replace the OCV.
|
-
OCV coil resistance
-
6.9—7.5 ohms [20°C {68°F}]
Spool Valve Operation Inspection
1.Verify that the spool valve in the OCV is in the maximum valve timing advance position as indicated in the figure.
-
• If there is any malfunction, replace the OCV.
|
-
Note
-
• When applying battery positive voltage between the OCV terminals, the connection can be either of the following:
-
― Positive battery cable to terminal A, negative battery cable to terminal B― Positive battery cable to terminal B, negative battery cable to terminal A
-
2.Apply battery positive voltage between the OCV terminals and verify that the spool valve operates and moves to the maximum valve timing retard position.
-
• If there is any malfunction, replace the OCV.
|
|
3.Stop applying battery positive voltage and verify that the spool valve returns to the maximum valve timing advance position.
-
• If there is any malfunction, replace the OCV.