Menu +
Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors

INTAKE MANIFOLD VACUUM INSPECTION [SKYACTIV-G (WITHOUT CYLINDER DEACTIVATION (US))]

INTAKE MANIFOLD VACUUM INSPECTION [SKYACTIV-G (WITHOUT CYLINDER DEACTIVATION (US))]

SM2565702


id0113u0801500

1.Disconnect the evaporative hose No.3 (purge solenoid valve side) and install the vacuum gauge. (See PURGE SOLENOID VALVE REMOVAL/INSTALLATION [SKYACTIV-G (WITHOUT CYLINDER DEACTIVATION (US))].)

2.Verify that the intake air hoses are installed securely.

3.Warm up the engine.

4.Measure the intake manifold vacuum while idling (no load) using the vacuum gauge.

• If not within the specification, perform the following inspections.
― Check valve (between intake manifold and vacuum pump) (See VACUUM LINE INSPECTION [SKYACTIV-G (WITHOUT CYLINDER DEACTIVATION (US))].)
― Check valve (between vacuum pump and power brake unit) (See VACUUM LINE INSPECTION [SKYACTIV-G (WITHOUT CYLINDER DEACTIVATION (US))].)
― Air suction
• Installation areas of each vacuum hose
• Installation area of throttle body
• Installation area of fuel injector
• Installation area of PCV valve
• Installation area of intake manifold
Standard
Approx. –60.0 kPa {–450.0 mmHg, –17.7 inHg}